M8 Cable Connector Parameter
| Pin No. |
3 |
4 |
5 |
6 |
8 |
| Coding |
A |
A |
B |
A |
A |
| Pin for reference |
|
|
|
|
|
| Mounting type |
Right Angle |
| Rated Current |
4A |
4A |
3A |
2A |
1.5A |
| Rated Voltage |
60V |
60V |
30V |
30V |
30V |
| Operating Temperature |
-20℃ ~ +80℃ |
| Mechanical operation |
>500 mating cycles |
| Degree of protection |
IP67/IP68 |
| Insulation resistance |
≥100MΩ |
| Contact resistance |
≤5mΩ |
| Connector insert |
PA+GF |
| Contact plating |
Brass with gold plated |
| Nut/screw |
PA+GF |
| Contacts Termination |
Overmoulded |
| Coupling |
Threaded Coupling |
| Shielding |
Not Available |
| Standard |
IEC 61076-2-104 |
1.Connector contacts: Phosphorus bronze, Plugged and unplugged more longer.
2.Connector contacts is Phosphorus bronze with 3μ gold plated;
3.Products are strictly in accordance with 48 hours salt spray requirements.
4. Low pressure injection molding, better waterproof effect.
5.Accessories meet the environmental protection requirements.
6.Cable materials over UL2464 & UL 20549 certified.
1. OEM/ODM accepted.
2. 24-hour online service.
3. Small batch orders accepted, flexible customization.
4.Quickly produce drawings - sampling - production etc supported.
5. Product certification: CE ROHS IP68 REACH.
6. Company certification: ISO9001:2015
7. Good quality &factory directly competitive price.
Q. How long is the delivery time?
A: We ensure the fast delivery. Generally, it will take 2-5 days for small order or the stock goods; 10days to 15days for mass production after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order. Please contact us for details.
Q. How to place an order?
A5: Drop a message online or send to us an email about your demand and order quantity. Our sales will contact you very soon.
Q. How to proceed the order if I have logo to print?
A. Firstly, we will prepare artwork for visual confirmation, and next we will produce a real sample for your second confirmation. if mock up is ok, finally we will go to mass production.
Q. What is the delivery time? (How long do you need me to prepare my goods? )
A: 1-5 days for sample orders, 10-21days for mass production orders (based on different quantities, OEM, etc.)
Q. What's your payment terms?
A: Payment: T/T, Western Union, Money Gram, PayPal.
30% as deposit, 70% as balance before delivery.
100% payment for samples.